BEFORE INSTALLATION REQUIREMENT:
1. THE OUTLET (DRAINAGE) PIPE & WATER INLET MUST BE NEAR TO DISHWASHER.
2. THE DRAIN HOSE HOOK FROM THE GROUND MUST BE AT LEAST 300 MM ~ 500 MM.
3. CABINET CUT-OUT SIZE MUST BE READY BEFORE INSTALLATION
4. PREPARE A 13AMP POWER POINT INSIDE THE CABINET.
5. DO NOT PLACE ANY OBJECTS TO BLOCK THE VENTILATION OUTLET AT BOTTOM FRONT OF
DISHWASHER.
6. IF THERE IS A BASE OF CABINET, IT MUST BE STRONG ENOUGH TO WITHSTAND MORE THAN 60KG.
7. RECOMMENDED TO PREPARE SKIRTING BOARD, IT MUST BE INSTALLED ACCORDING TO THE
FIGURE 1.1
≥ 50mm
110mm
Figure 1.1
| General | Details |
|---|---|
| Name | FOTILE BD3B-G6 Dishwasher |
| Make | FOTILE |
| Language | English |
| Filetype | PDF (Download) |
| File size | 0.06 MB |

FOTILE BD2BV01 Dishwasher

FOTILE BD3B-G3-Y Luna Dishwasher

FOTILE BD2B-G2-Y Matte Glass Dishwasher

FOTILE BD2B-G2-Y Dishwasher

FOTILE SD2F-P5 3-in-1 In Sink Dishwasher

FOTILE SD2F-P3/SD2F-P3L 2 In 1 Sink Dishwasher

FOTILE SD2F-P3, SD2F-P3L In Sink Dishwasher

FOTILE SD2F-P6 3 In 1 Sink Dishwasher

FOTILE BD2B-G5 Dishwasher

FOTILE BD3B-G6 Dishwasher Overview
Summary of Contents
- Page 1: Before installation requirement: The outlet (drainage) pipe and water inlet must be near to the dishwasher. The drain hose hook from the ground must be at least 300 mm to 500 mm. Cabinet cut-out size must be ready before installation. Prepare a 13 amp power point inside the cabinet. Do not place any objects to block the ventilation outlet at the bottom front of the dishwasher. If there is a base of the cabinet, it must be strong enough to withstand more than 60 kg. Recommended to prepare a skirting board, it must be installed according to the figure.