Home > Fisher & Paykel > FISHER PAYKEL DW24UT2I2 Dishwasher
FISHER PAYKEL DW24UT2I2 Dishwasher
SERVICES PREPARATION
DOOR PANEL PREP
Flush water line into a bucket.
Ensure door panel meets
all specifications.
Install a hand shut-off valve in a
readily accessible location in the
adjacent cabinetry.
1
2
3
4
1
2
3
4
Hot water line installations:
Using the template as a guide, pre-drill
all holes into the panel.
Carefully route the hot water line
through the service hole in the side of
the cabinetry.
Route the hard wiring through the
service hole in the side of the cabinetry.
Tape to the floor to secure.
Ensure the sliding bracket is oriented
correctly before securing it to the panel.
Remove the toe kick by unscrewing the
four screws.
Loosely fit both 16mm Philips hanging
screws onto the door panel. Ensure
there is a minimum space of 1/8" (3mm)
between the screw-head and the panel.
Keep aside for re-assembly at the end of
the installation.
13
| General | Details |
|---|---|
| Name | FISHER PAYKEL DW24UT2I2 Dishwasher |
| Make | Fisher & Paykel |
| Language | English |
| Filetype | PDF (Download) |
| File size | 1.28 MB |

FISHER PAYKEL DD24DCHTX9 N Dishwasher

FISHER PAYKEL DD24DCTW9N Dishwasher

FISHER PAYKEL DD24SCTX9 N Dishwasher

FISHER PAYKEL DD60SCHX9 Dishwasher

FISHER PAYKEL DD24DI9N Sanitize Dishwasher

FISHER PAYKEL DD24SV2T9N Sanitize Tall Dishwasher

FISHER PAYKEL DD60DAX9 Dishwasher

FISHER PAYKEL DD60SDFHTX9 Dishwasher

FISHER PAYKEL DW24UT4I2 Dishwasher

FISHER PAYKEL DD24SVT9 Dishwasher



































