HOBART CLCS66e ML Series Dishwasher
8. Adjust pressure regulator
in the cold water plumbing
assembly (located under
unload end of machine) until
final rinse pressure gauge
reads 20 ± 5 PSI.
COLD WATER
PRESSURE
REGULATOR
Fig. 17
9. After the cold water pressure is established, reconnect the thermistor (6QTM)
connection.
a) Verify red light on solid state thermostat (1SST) is ON.
b) Verify warm water valve (4SOL) turns off.
c) Verify hot water valve (1SOL, located under unload end of machine) turns
ON.
10. Adjust the pressure regulator
in the hot water plumbing
assembly (located under
unload end of machine) until
HOT WATER
VALVE (1SOL)
final rinse pressure gauge
readingmatchesthevalueset
for the cold water supply, 20 ±
5 PSI.
HOT WATER
PRESSURE
REGULATOR
Fig. 18
11. Press power button on keypad to turn machine off.
12. Turn main power to machine OFF at customer’s disconnect.
13. Open door of dishwasher and remove dish rack from final rinse zone.
14. Replace the top cover on the control box.
15. Replace the end cover at the unload end of machine.
16. Turn main power to the machine ON at customer’s disconnect; machine is
now ready for normal operation.
– 18 –
| General | Details |
|---|---|
| Name | HOBART CLCS66e ML Series Dishwasher |
| Make | HOBART |
| Language | English |
| Filetype | PDF (Download) |
| File size | 2.18 MB |

HOBART AM16 Commercial Dishwasher

HOBART S.48820 Commercial Dishwasher





















































