HOBART CLCS66e ML Series Dishwasher
CLeR AIR FLOW ADJUSTMENT
1. Turn main power to machine OFF at customer's disconnect.
2. Open door of dishwasher and insert a dish rack upside down in final rinse zone
to activate final rinse flow.
3. Turn main power to machine ON at customer's disconnect.
4. Press power button on keypad to turn machine on. (Located on front of main
control box).
5. Press start button on keypad to turn pumps and final rinse on.
6. Verify that the tank
ADJUST DAMPER
SHAFT TO
HORIZONTAL
temperature(s) and final rinse
temperature are above the
minimum requirements. (If
not, press the stop button on
keypad to turn pumps off and
allowtemperaturestoheatup.)
7. Completely close vent by
adjusting vent stack damper
shaft to horizontal position.
8. Ventstackdamperadjustment:
Fig. 19
Opening the vent stackdamper too farmay causelow tanktemperatures.
a) For pant leg vent systems, adjust the vent stack damper shaft until the
steam escaping from around the bottom of the energy recovery hood and
curtain is eliminated. (Note: Do not over adjust the damper. Adjust in small
increments just until the steam is eliminated. If curtain is being drawn in,
damper is overadjusted.)
b) For canopy hood vent systems,
adjust the vent stack damper shaft to
approximately 15° to 25° open.
Fig. 20
– 19 –
| General | Details |
|---|---|
| Name | HOBART CLCS66e ML Series Dishwasher |
| Make | HOBART |
| Language | English |
| Filetype | PDF (Download) |
| File size | 2.18 MB |

HOBART AM16 Commercial Dishwasher

HOBART S.48820 Commercial Dishwasher





















































